Olympic Region Clean Air Agency (ORCAA) issued a determination of non-significance (DNS) under the State Environmental Policy Act Rules (Chapter 197-11 WAC) for the following project: Interfor US – Port Angeles Division proposes to extend the length of an existing lumber dry kiln to increase production capacity. The facility is located at 243701 Highway 101 West, Port Angeles.
After a review of a completed environmental checklist and other information on file with the agency, ORCAA has determined that this proposal will not have a probable significant adverse impact on the environment.
Copies of the DNS are available via the links below (PDF files). The public is invited to comment on this DNS by submitting written comments no later than 4:30 p.m., April 27, 2021. Send comments via email to lauren.whybrew@orcaa.org or via US Mail to:
ORCAA
2940 Limited Lane NW
Olympia, WA 98502