Notice of Construction: Kloeckner Metals Corporation

The following applications for approval of construction or modification of an air pollution source have been received by ORCAA. A formal public comment period will be provided if requested by any person, government agency, group, or applicant.

Description:

Kloeckner Metals Corporation (Kloeckner) seeks pre-approval from Olympic Region Clean Air Agency (ORCAA) to replace the existing ESAB Avenger metal cutting table with a new Alltra HG16-12S metal cutting table at their facility located at 3215 Cougar Ln SW, Tumwater, Washington. Regulated air pollutants impacted by the project include HAP, TAP, Nitrogen Dioxide, Particulate Matter, PM10, and PM2.5. Since the new cutting table will cut the same materials and use the same fuels as the cutting table it will replace, the project will not result in an increase in potential to emit.

  • Notice Type: Notice of Construction (NOC)
  • Posted: June 25, 2026
  • Name of Business: Kloeckner Metals Corporation
  • Address: 3215 Cougar Lane Southwest, Tumwater, WA
  • Source: Classification RC5
  • Notice #: 26NOC1777
  • Application as Received: NOC Application
  • Status: Closed For Comment

Comment period is closed

To express interest in an application, submit your comments in writing by the deadline listed below. Please be sure to list the Notice # of the application you are commenting on.

  • Comment Period Opens: June 25, 2026 4:00 pm
  • Deadline: July 10, 2026 4:00 pm
  • Notice #: 26NOC1777
  • Point of Contact: Aaron Manley, 360-539-7610
  • Email: aaron.manley@orcaa.org
  • Fax: (360) 491-6308
  • Mail: ORCAA, 2940 Limited Lane NW, Olympia, WA 98502

What are Notice of Construction Permits?

Notice of Construction (NOC) permits are required prior to the construction, installation, replacement, or modification of any air pollutant sources, emissions units, or air pollution control equipment. Once approved and issued by ORCAA, the NOC allows not only the ‘construction’ but also the ongoing operation of that source or emissions unit. The NOC is in force until the source or emissions unit is modified or replaced, at which time a new NOC permit is required. Learn more about the NOC program.

Notices & Hearings

Find other notices or registered businesses in our region

Check out our map, and look up businesses by notices or classification source